Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BRING ENERGY LIMITED

8 unique locations (105 components)

Active MW: 0.00 MW
Inactive MW: 22.09 MW
THE MEADWAY REDDITCH WORCESTERSHIRE B97 (3 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• Domestic EV charger
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2025-26 (T-4), 2023-24 (T-1) ...
KENT ROAD HALESOWEN WEST MIDLANDS B62 (3 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• Domestic EV charger
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
Active • 2025-26 (T-4), 2023-24 (T-1) ...
HIGH DRIVE NEW MALDEN KT3 (3 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• Domestic EV charger
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Engie Great Coates, Grimsby, DN31 2TT (35 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2023-24 (T-1), 2022-23 (T-1) ...
Engie Great Coates, Grimsby, DN31 2TT (53 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
CHERTSEY ROAD WINDLESHAM SURREY GU20 (3 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• Domestic EV charger
• New build gas generator
Active • 2025-26 (T-4), 2023-24 (T-1) ...
BROADWAY WORSLEY MANCHESTER LANCASHIRE M28 (3 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Domestic EV charger
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2025-26 (T-4), 2023-24 (T-1) ...
BEDFORD ROAD SUTTON COLDFIELD WEST MIDLANDS B75 (2 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
• EV charging at residential premises
Active • 2028-29 (T-4), 2023-24 (T-1)
Loading map...
Showing 8 locations