Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

BRYT ENERGY LIMITED

15 unique locations (32 components) - Page 1 of 2

White Rose Technology Centre, Don Pedro Avenue, Normanton, WF6 1TD (2 components)

0.5MW - 1.15MWh Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified WF6
Active • 2025-26 (T-4), 2022-23 (T-1)
Tynegrain Ltd, Tyne Dock, South Shields, NE34 9PL (2 components)

2mW 2.3MWH Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified NE34
Active • 2025-26 (T-4), 2022-23 (T-1)
Tynegrain Ltd, Tyne Dock, South Shields NE34 9PL (2 components)

0.35MWe CHP plant (2)

DSR BRYT ENERGY LIMITED Not Prequalified NE34
Active • 2025-26 (T-4), 2022-23 (T-1)
Timico Limited, Audley Avenue Industrial Estate, Newport, Shropshire, TF10 7BX, (2 components)

0.5MW - 0.5MWh Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified TF10
Active • 2025-26 (T-4), 2022-23 (T-1)
The Pyramids Business Park, Bathgate, West Lothian, EH48 2EH (2 components)

750kW - 750kWh Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified EH48
Active • 2025-26 (T-4), 2022-23 (T-1)
Stellium Data Centres, Cobalt Business Park, 9 Cobalt Park Way, NE289EJ NE28 9EJ (2 components)

2MW - 2.3MWh Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified NE2
Active • 2025-26 (T-4), 2022-23 (T-1)
Skymark Packaging, Mannaberg Way, Scunthorpe, DN15 8XF (4 components)
• 0.8MWe CHP plant (2)
• 1MW - 1.15MWh Battery Energy Storage System
DSR Battery BRYT ENERGY LIMITED Not Prequalified DN15
Active • 2025-26 (T-4), 2022-23 (T-1)
NTT Communications HH3, The Campus, Maylands Avenue, Hemel Hempstead, HP2 7EF (2 components)

10MW - 11.5MWh Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified HH3
Active • 2025-26 (T-4), 2022-23 (T-1)
Kingston Hospital, Galsworthy Rd, Kingston upon Thames KT2 7QB (2 components)

2MW - 2.3 MWH Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified KT2
Active • 2025-26 (T-4), 2022-23 (T-1)
Hortonwood 37, Donnington, Telford TF1 7GT (2 components)

1MW / 1.15 MWH Battery Energy Storage System (2)

DSR Battery BRYT ENERGY LIMITED Not Prequalified TF1
Active • 2025-26 (T-4), 2022-23 (T-1)
Loading map...
Showing 10 locations