Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BIOGAS TECHNOLOGY LIMITED

7 unique locations (38 components)

Active MW: 49.62 MW
Inactive MW: 94.36 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components)

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Active • 2022-23 (T-3), 2023-24 (T-4)
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2022-23 (T-3), 2023-24 (T-4) ...
Land off Linketty Lane, Marshall Road, Plymouth PL7 4NR (2 components)

Gas fuelled Generating Sets

Active • 2022-23 (T-3), 2023-24 (T-4)
Land off A40 (London Road), Wheatley, OX33 1YL (8 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Active • 2022-23 (T-3), 2023-24 (T-4)
Land at Langley's Lane, Old Mills, Radstock, BS39 7SS (8 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2022-23 (T-1), 2022-23 (T-3) ...
Elevator Road, Trafford Park M17 1BR (3 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (11 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Active • 2021-22 (T-4), 2022-23 (T-1) ...
Loading map...
Showing 7 locations