Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BIOGAS TECHNOLOGY LIMITED

2 unique locations (12 components)

Active MW: 12.35 MW
Inactive MW: 131.63 MW
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (11 components)
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Active • 2023-24 (T-4), 2022-23 (T-1) ...
OAK DRIVE SAXON VALE ELLINGTON MORPETH NORTHUMBERLAND NE61 (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-1)
Loading map...
Showing 2 locations