CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

9 unique locations (388 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (13 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cottam Development Centre Power Station Cottam Retford DN22 0TF (7 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...