CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

2 unique locations (38 components)

Active MW: 619.98 MW
Inactive MW: 4414.26 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (11 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 2 locations