Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CONRAD ENERGY (DEVELOPMENTS) LIMITED

49 unique locations (594 components) - Page 1 of 2

Active MW: 750.17 MW
Inactive MW: 2077.54 MW
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (6 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cut Throat Lane Witham Essex CM8 2SZ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3)
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3)
Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3)
Energy Center, Ashton Street, Liverpool, L69 3GB (68 components)
• Longannet coal fired power station - Unit 3
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EnviroWales - Ebbw Vale - Site 2, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (17 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (6 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fort Parkway Heartlands Birmingham B24 9QT (7 components)
• Aggregate CMU from multiple sources
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Existing OCGT
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Grain Road Isle of Grain Rochester Kent ME3 0EH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3)
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Harworth Colliery, Harworth Park Industrial Estate, Scrooby Road, Harworth, Doncaster, South Yorkshire, DN11 8AB. (9 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 3 x Jenbacher 420 (1.4MW)
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (6 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hollinwood Avenue Chadderton OL9 8EP (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Ketton Works, Stamford, PE9 3SX (5 components)
• Hanson site - Is Load Reduction/ Turn Down
• Proven reduction of site consumption
Active • 2025-26 (T-1), 2022-23 (T-4) ...
Land at Common Side Lane, Featherstone, WF7 6RA (10 components)

New reciprocating gensets in acoustic enclosure

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land lying to the north of Salisbury Road Ringwood BH24 1AL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land lying to the north of Salisbury Road Ringwood BH24 1AL (2 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Reciprocating Engines
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Land On The North Side Of Kerfoot Street Warrington, WA2 8NT (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• New build power station comprised of multiple reciprocating engines.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations