CONRAD ENERGY (DEVELOPMENTS) LIMITED

2 unique locations (33 components)

Active MW: 697.08 MW
Inactive MW: 2130.64 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (13 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...