CONRAD ENERGY (DEVELOPMENTS) LIMITED

140 unique locations (1830 components) - Page 1 of 6

Active MW: 750.17 MW
Inactive MW: 2077.54 MW
1 Thane Road West, Nottingham, NG2 3AA (125 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4 Guildford Road Cranleigh GU6 8PE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2024-25 (T-4), 2021-22 (T-1)
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2024-25 (T-4), 2021-22 (T-1)
Adsworth Road, Stockport, SK3 8LF (3 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2021-22 (T-1)
Appley Bridge Landfill Appley Lane N Appley Bridge Wigan WN6 9AD (1 component)

Hanson site - Is Load Reduction/ Turn Down

Inactive • 2023-24 (T-4)
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• Gas engine
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Beale Valley Landfill Royton Rochdale OL1 4LT (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Blacknell Lane Crewkerne TA18 7HE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4)
Bridgewater Paper Mill, North Road, Ellesmere Port CH65 1AL (5 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bush Estate, Penicuik EH26 0QA. (1 component)

Load reduction on site supported by standby generation.

Inactive • 2021-22 (T-4)
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Cards Road, Sandon CM2 7AE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (99 components)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (6 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations