Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Centrica Business Solutions UK Optimisation Limite

11 unique locations (133 components) - Page 1 of 2

Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kemsley Mill, SittingBourne, Kent, ME10 2TD (4 components)
• One 40MWe gas Turbine Generation unit (2)
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (17 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (35 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (15 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Denison Road, Selby, North Yorkshire YO8 8AN (18 components)

One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (6 components)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Low Moor Bradford BD12 0JZ (4 components)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1 (2)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (6 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (2)
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (4 components)

Turbo Expander - for pressure reduction of incoming natural gas (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 10 locations