DRAX RIVER HYDRO LIMITED

11 unique locations (773 components)

Active MW: 315.00 MW
Inactive MW: 8630.72 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (4 components)
• Kendoon hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (7 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LE12 (252 components)
• EV charging at residential premises (2)
• CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BL4 (27 components)
• Domestic demand turn down
• EV charging at residential premises
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL2 (51 components)
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• EV charging at residential premises
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
5.47 MW
BD9 (18 components)
• EV charging at residential premises (2)
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.38 MW
BB7 (117 components)
• EV charging at residential premises (2)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B92 (91 components)
• EV charging at residential premises
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load curtailment from refridgeration
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.03 MW
AL7 (60 components)
• EV charging at residential premises (2)
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.43 MW
AL1 (92 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AB12 (54 components)
• EV charging at residential premises (2)
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-4) ...