Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DRAX RIVER HYDRO LIMITED

10 unique locations (16 components)

Active MW: 315.00 MW
Inactive MW: 8630.72 MW
Willows Avenue Lytham FY8 (1 component)

Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Inactive • 2017-18 (T-1)
Ways End Camberley Surrey GU15 (1 component)

Kendoon hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.

Inactive • 2017-18 (T-1)
Tongland, Kirkcudbrightshire. DG6 4LT. Scotland (6 components)
• Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Post Lane Bookham KT23 (1 component)

Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Inactive • 2017-18 (T-1)
OLD GOLF COURSE ROAD ARMADALE BATHGATE WEST LOTHIAN EH48 (1 component)

Glenlee hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 30MVA or 24MW at 0.8PF. Each of the 2 components = 12MW.

Inactive • 2017-18 (T-1)
LYSANDER DRIVE BRACKNELL BERKSHIRE RG12 (1 component)

Kendoon hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.

Inactive • 2017-18 (T-1)
Lodge Cottage Lodge Lane MAnchester Road Leigh Lancashire WN7 (1 component)

Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.

Inactive • 2017-18 (T-1)
GRAYSTON CHRYSTON GLASGOW LANARKSHIRE G69 (1 component)

Glenlee hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 30MVA or 24MW at 0.8PF. Each of the 2 components = 12MW.

Inactive • 2017-18 (T-1)
ASH TREE DRIVE CWMBRAN GWENT NP44 (1 component)

Kendoon hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.

Inactive • 2017-18 (T-1)
ANGLIAN WAY COVENTRY CV3 (2 components)
• EV charging at residential premises
• Kendoon hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.
Inactive • 2023-24 (T-1), 2017-18 (T-1)
Loading map...
Showing 10 locations