Dockside Power Limited

81 unique locations (7288 components) - Page 1 of 4

Active MW: 143.01 MW
Inactive MW: 1805.50 MW
AB51 (95 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.62 MW
ARMITAGE WAY NORTHWICH CW8 (2 components)
• 2 hour containerised battery storage
• CMU consists of reciprocating engines located in Swansea connected to the WPD system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2028-29 (T-4), 2018-19 (T-4)
B61 (95 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B91 (169 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
BA1 (88 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BAKER ROAD ABINGDON OXFORDSHIRE OX14 (2 components)
• Battery energy storage unit
• Reciprocating engines
Active • 2028-29 (T-4), 2016-17 (TR)
BS16 (169 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS48 (72 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
5.67 MW
CB23 (173 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CM22 (52 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
11.23 MW
CM3 (165 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CO10 (71 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CO4 (102 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
COTTAGE RED HILL ROAD IPSWICH IP7 (2 components)
• CMU consists of reciprocating engines located in Wallsend connected to the NPG system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• New Build Battery Storage Site.
Active • 2028-29 (T-4), 2018-19 (T-4)
COTTAGE SOUTH BANTASKINE FALKIRK FK1 (2 components)
• CMU consists of reciprocating engines located in Swansea connected to the WPD system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Lithium-based battery energy storage system
Active • 2025-26 (T-1), 2018-19 (T-4)
COUNCIL S NORANSIDE FORFAR ANGUS DD8 (2 components)
• CMU consists of reciprocating engines located in Merthyr Tydfil connected to the WPD system at 33kV. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• The construction involves the development of a Battery Storage Energy System on a site close to the grid connection point. The works involve ground works in preparation for the installation of battery blocks and the associated electrical components (PCS units, SCADA system, CCTV etc.). The Engineering, Procurement, Construction and Commissioning works are estimated to take around 15 months during which time arrangements will also be made for the cabling and installation of the selected technology.
Active • 2028-29 (T-4), 2018-19 (T-4)
CR3 (78 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
18.91 MW
CV22 (123 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CV34 (132 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CW2 (97 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DA11 (51 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
11.35 MW
DH6 (67 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
EH27 (11 components)

Domestic EV charger

Active • 2025-26 (T-4)
G71 (69 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
G77 (156 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.91 MW
Loading map...
Showing 25 locations