Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Dockside Power Limited

15 unique locations (163 components)

Active MW: 146.59 MW
Inactive MW: 1801.92 MW
Brook Farm, Arncott, OX25 1NY (2 components)
• Gas fired reciprocating engines.
• N/A
Inactive • 2022-23 (T-4)
Brunel Way, Briton Ferry, SA11 2GA (14 components)
• Gas fired reciprocating engines.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cauldon Works, Yelsway Ln, Cauldon, Stoke-on-Trent ST10 3EQ (7 components)

Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
• Load drop
• Load drop by on-site generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harts Farm Way, Havant, PO9 1HS (4 components)
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Main Ave, Hirwaun, CF44 9UY - Please see additional information note accompanying connection agreements. (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2022-23 (T-4)
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pengarnddu Ind Est, Dowlais Top CF48 2TA - Please see additional information note accompanying connection agreements. (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2022-23 (T-4)
RIVERSIDE WHARF 40-45, HERRINGHAM ROAD, LONDON, SE7 8SJ (7 components)
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Tir John N Rd, St Thomas, SA1 8NZ (10 components)
• 10 MW of demand reduction
• Reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
to be provided once CMU Components are known (91 components)
• Aggregated Generation - Diesel
• The CMU component is an aggregation of turn-down and onsite generation
• to be provided once CMU Components are known
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (3 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 15 locations