Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

150 unique locations (576 components) - Page 1 of 6

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
Yeomans Way, Bournemouth, BH8 0BQ (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2018-19 (T-1)
Visitors Car Park, Alexandra Park, Alexandra Drive, St Helens, WA10 3TP (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A, The Loddon Centre, Basingstoke RG24 8FL (3 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the SSE distribution network and local gas network.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (7 components)
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 meter at the distribution boundary and has no auxilliary load or additional generation on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
To be confirmed once components are known (12 components)

To be confirmed once components are known

Inactive • 2021-22 (T-4)
25.04 MW
The Power House Commercial Road Wolverhampton WV1 3QS (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
The Owlcotes Centre, Varley Street, Pudsey, LS28 6AR (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
The Mall, Patchway, Bristol, BS34 5QT (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components)

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
Roydon & Ltd Swinton - Unit 1 Junction Eco Park,, Rake Lane, Swinton. M27 8LU, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (3 components)

A gas engine CHP site providing hot water to agricultural greenhouses

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (3 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (1 component)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2018-19 (T-1)
Red Roofs Nursery Limited Dunswell Road Cottingham Hull East Yorkshire HU16 4JT (3 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited Dunswell Road Cottingham Hull East Yorkshire HU16 4JT (1 component)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations