Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

70 unique locations (1711 components) - Page 1 of 3

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (52 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
XPO - Taunton, 29 Frobisher Way, Taunton TA2 6BB (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (20 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
William Lee - Site 4, Callywhite Lane, Dronfield, S182XU (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
William Lee - Site 1, Callywhite Lane, Dronfield, S182XU (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (21 components)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.59 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (21 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (38 components)
• 1 x hydro turbine & synchronous generator
• Post-refurbishment generating unit 1
• Post-refurbishment generating unit 1: single hydro turbine & synchronous generator
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (14 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Tongland, Kirkcudbrightshire, DG6 4LT, Scotland (21 components)
• Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components is 11MW.
• Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
To be confirmed once CMU components are known (98 components)

To be confirmed once CMU components are known

DSR E.ON UK PLC Conditional
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
19.27 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (47 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (24 components)
• Kendoon hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (17 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Severn Power Station West Nash Road Nash Newport NP18 2BZ (19 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (11 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (13 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (43 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (20 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.00 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations