Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

116 unique locations (660 components) - Page 3 of 12

Active MW: 814.87 MW
Inactive MW: 2809.36 MW
Barnet Road, St Albans, AL2 1BG (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Baronet Works, Baronet Road, Warrington, WA4 6HA (2 components)

Chemical plant carrying out DSR using load turn-down.

Inactive • 2017-18 (TR)
Billerudkorsnäs Beetham Ltd Waterhouse Mills Beetham, Milnthorpe Cumbria LA7 7AR (1 component)

Load Shedding - This DSR component is a paper manufacturing site, which can reduce its power demand by control of its manufacturing process

Inactive • 2018-19 (T-1)
Billerudkorsnäs Beetham Ltd Waterhouse Mills Beetham, Milnthorpe Cumbria LA7 7AR (2 components)

Load Shedding - This DSR component is a paper manufacturing site, which can reduce its power demand by control of its manufacturing process

Inactive • 2018-19 (T-1)
1.94 MW
Billingham Site, Haverton Hill Road, Billingham, TS23 1PY (6 components)

Chemical plant carrying out DSR using load turn-down.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bluewater Pkwy, Dartford, Greenhithe DA9 9SD (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Brookfield Centre, Halfhide Lane, Cheshunt, EN8 0TZ (3 components)

Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Broomhouse Lane, Edlington, Doncaster, DN12 1ES (4 components)
• DSR Component providing load turn down at a manufacturing site
• DSR Component providing load turn down at a piping systems manufacturing site
Inactive • 2021-22 (T-4), 2020-21 (T-1)
5.18 MW
Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (1 component)

DSR component offering flexibility delivered by load turn down at a data centre

Inactive • 2021-22 (T-4)
25.90 MW
Centro 3, Maxted Close, Hemel Hempstead, Hertfordshire, HP2 7SU (3 components)

Back up generation at a data centre

Inactive • 2018-19 (T-1)
5.18 MW
Loading map...
Showing 10 locations