Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ECOTRICITY (SMART GRID) LIMITED

1 unique locations (4 components)

Active MW: 5.06 MW
Inactive MW: 5.92 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 1 locations