EDF ENERGY (THERMAL GENERATION) LIMITED

8 unique locations (40 components)

Active MW: 12486.02 MW
Inactive MW: 37312.94 MW
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (5 components)
• 2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery (2)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Chartham Paper Mill Station Road Chartham CANTERBURY Kent CT4 7JA (4 components)
• AEI steam turbine and alternator. The generating output is directly proportional to site steam demand. The connection capacity of 270 kWh is that achieved with a site steam demand of 8.1 tonnes/hour.
• Centrax KB-7S gas turbine and alternator. Generating output is directly linked to air temperature at the compressor inlet (and hence ambient air temp). The connection capacity is the quote max. capacity at zero Celsius.
Inactive • 2017-18 (T-1)
Chilham MCC, Mill Lane, Chilham, Kent CT4 8EF (6 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Edge Green Lane Golborne, Warrington, WA3 3SP (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Land off Kid Glove Road - Golborne - Wigan - WA3 3DP (5 components)

2x 1.56MW Containerised Generating Sets. Goldbourne 1 - Land off Kid Glove Road - Golborne - Wigan - WA3 3DP. Auxiliary load subtracted prior to the metering point.

Inactive • 2017-18 (T-1)
New Hall Farm, School Lane, Warrington, WA3 6LH (4 components)

A new build diesel fuelled generating station.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 8 locations