Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EDF ENERGY (THERMAL GENERATION) LIMITED

174 unique locations (9268 components) - Page 1 of 7

Active MW: 3919.04 MW
Inactive MW: 45879.92 MW
AB39 (46 components)
• Domestic demand turn down
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL1 (92 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
214.48 MW
ALDERNEY AVENUE NEWTON LEYS BUCKINGHAMSHIRE MK3 (2 components)
• A combination of standby generation and load reduction.
• West Burton A Power Station CMU 1
Inactive • 2019-20 (T-4), 2016-17 (TR)
432.54 MW
ALTRINCHAM ROAD WILMSLOW CHESHIRE SK9 (1 component)

West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)

Inactive • 2019-20 (T-1)
72.09 MW
ANNETHOMAS CRESCENT, COPCUT, DROITWICH, SPA WORCESTERSHIRE, WR9 (2 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-2 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4)
B14 (28 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B15 (31 components)
• Domestic EV charger
• Domestic demand turn down
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
72.12 MW
B63 (53 components)
• Bus depot site
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B76 (60 components)
• EV charging at residential premises (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B90 (169 components)
• A gas engine CHP site providing hot water to a local district heating network
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• This CMU unit is Causeymire wind farm, an onshore wind farm located in Scotland
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B96 (19 components)
• Domestic EV charger (2)
• Domestic EV charge point
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BA16 (13 components)
• Domestic EV charger
• Domestic demand turn down
• electricity storage site comprising brand new batteries, inverters and associated connection plant
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BB9 (36 components)
• Didcot B5 - CCGT MSID: 4055
• EV charging at residential premises
• Load drop
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BD16 (53 components)
• EV charging at residential premises (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BH12 (39 components)
• A gas engine CHP site providing hot water to a local district heating network
• Domestic EV charger
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BL3 (54 components)
• EV charging at residential premises (2)
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BN12 (45 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BN5 (29 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
BR4 (38 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BRACKEN ROAD THETFORD NORFOLK IP24 (2 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• West Burton A Power Station CMU 2 WA2-20 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
Active • 2025-26 (T-4), 2021-22 (T-1)
105.85 MW
BS10 (37 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BS24 (71 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS30 (48 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS31 (70 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BUCKS HILL NUNEATON WARWICKSHIRE CV10 (1 component)

West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + …

Inactive • 2022-23 (T-1)
Loading map...
Showing 25 locations