Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

629 unique locations (5200 components) - Page 10 of 26

Active MW: 2892.88 MW
Inactive MW: 7285.73 MW
Lowestoft Ness Point TPS, LOWESTOFT-NESS POINT TPS, Gas Works Road, Ness Point Oulton, LOWESTOFT Suffolk, NR32 1UZ (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Lower New Road, Cheddar, BS27 3DY (3 components)

"Bristol Water Plc Cheddar Road, Axbridg, Cheddar, BS26 2DL The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive • 2017-18 (TR)
Lower Lane, Bishop's Waltham, Winchester, Hampshire, South East, SO32 1AS (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Lower Lane, Bishops Waltham, Southampton, S032 1AS (3 components)

"Portsmouth Water Lower Lane, Bishops Waltham, Southampton, S032 1AS The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive • 2017-18 (TR)
Lower Lane, Bishops Waltham, Bishops Waltham, Southampton, SO32 1AS (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Lovely Lane, Warrington, Cheshire WA5 1QG (6 components)

Natural Gas fired CHP unit at Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Lovedean Pumping Station, Lovedean Lane, Waterlooville, P08 9RY (3 components)

"Portsmouth Water Lovedean Pumping Station, Lovedean Lane, Waterlooville, P08 9RY The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for …

Inactive • 2017-18 (TR)
Lovedean Lane, Lovedean Pumping Station, Waterlooville, PO8 9RY (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Louth STW, LOUTH STW, Keddington Lane, Heddington Corner, LOUTH Lincolnshire, LN11 7DX, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Lots Road, Chelsea, London SW10 0SW (7 components)

Standby generation

Active • 2025-26 (T-4), 2025-26 (T-1) ...
9.98 MW
Lots Road, Chelsea, London SE10 0QG (12 components)

Standby generation

Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
London Road, Biggleswade, SG18 9TH (3 components)

"Anglian Water Services Ltd London Road, Biggleswade, SG18 9TH The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive • 2017-18 (TR)
Lockerbie Creamery, Lockerbie, England. DG11 1LW (22 components)

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loch Eilde Mor Hydro, Kinlocheven PH50 4SF (1 component)

Hydroelectric power generation

Active • 2025-26 (T-4)
Littleton-upon-Severn, Bristol, BS35 1NT (3 components)

"Bristol Water Plc Littleton-upon-Severn, Bristol, BS35 1NT The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that …

Inactive • 2017-18 (TR)
Littlecoates WW, LITTLECOATES WW, Chelmsford Avenue, GRIMSBY, DN34 5BY, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Lifton, Radstock, BA3 4PR (3 components)

"Bristol Water Plc Lifton, Radstock, BA3 4PR The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that …

Inactive • 2017-18 (TR)
Leys Rd, Brockmoor, Brierley Hill DY5 3UJ, United Kingdom (4 components)

The CMU Component reduces demand

Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.81 MW
Level Mare Lane, Westergate Pumping Station, Chichester, PO20 3SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Loading map...
Showing 25 locations