Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

631 unique locations (5208 components) - Page 10 of 64

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Stephenson Street, West Ham, London E16 4SA (15 components)

Standby generation.

Active • 2025-26 (T-4), 2025-26 (T-1) ...
14.97 MW
Steetley Dolomite, Whitwell, Worksop S80 3LJ (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
1.98 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (34 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Station Road, Wigton, Cumbria CA7 9BG (58 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
STATION ROAD, NEWCASTLE UPON TYNE, NE12 6RH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
Station Road, Blagdon, Bristol, BS40 7UN (3 components)

"Bristol Water Plc Station Road, Blagdon, Bristol, BS40 7UN The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive • 2017-18 (TR)
Stanbridgeford STW, STANBRIDGEFORD STW, A505 Bypass, Stranfordbridge, LEIGHTON BUZZARD Bedfordshire, LU7 9JG, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP8 3BG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
SPROUGHTON-RIVER INTAKE WA , SPROUGHTON, IP8 3BG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP1 5AQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Loading map...
Showing 10 locations