Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

584 unique locations (3698 components) - Page 11 of 59

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Sleaford STW, SLEAFORD STW, Bonemill Lane, SLEAFORD Lincolnshire, NG34 7DL, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Shortwood Road, Pucklechurch, Bristol, BS16 9PQ (2 components)

"Bristol Water Plc Shortwood Road, Pucklechurch, Bristol, BS16 9PQ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive • 2017-18 (TR)
Shortlands (Bromley) WTW, Valley Road, Shortlands, Bromley, United Kingdom, BR2 0HB (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
SHENLEY GROUNDS WB, WHADDON ROAD CALVERTON, MK19 6EU (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Sheffield Forgemasters, Brightside Ln, Sheffield S9 2RW (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4)
Sheepwash Lane, Aldingbourne Pumping Station, Chichester, PO18 0FA (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Shalford WTW, The Street, Shalford, Guildford, United Kingdom, GU4 8BW (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Semer WTW, Semer WTW, Hadleigh Road, Inbetween Semer/Nedging, IPSWICH, IP7 7HF, (4 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations