Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

706 unique locations (7275 components) - Page 14 of 29

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (4 components)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Inactive •
Franklaw, Catterall Lane, Catterall, UK, PR3 0PJ (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
6.04 MW
Fring WTW, FRINWW, Fring Road, Great Bircham, KING'S LYNN Norfolk, PE31 6SH, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Funtington, Chinchester, Chinchester, P018 (4 components)

"Portsmouth Water Funtington, Chinchester, Chinchester, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is …

Inactive •
Funtington, Chinchester, PO18 9LG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Gatehampton (Goring) Borehole, Gatehampton Road, Goring-on-Thames, Reading, United Kingdom, RG8 9LU (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
4.09 MW
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (45 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Inactive •
9.48 MW
Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
8.95 MW
Gold Cross, Pensford, Bristol, BS39 4DL (4 components)

"Bristol Water Plc Gold Cross, Pensford, Bristol, BS39 4DL The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Inactive •
Gorse Street, Blackburn, BB1 3EU (4 components)

"EMR European Metal Recycling Gorse Street, Blackburn, BB1 3EU The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive •
14.00 MW
GRAFHAM DAM PS , PERRY, PE19 5XH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
8.08 MW
GRAFHAM DAM PS , PERRY, PE28 0BW (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
GRAFHAM DAM PS, PERRY, PE28 0BW (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
8.08 MW
GRAFHAM INTAKE (OFFORD) WA, OFFORD, PE19 5RG (22 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
8.08 MW
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Grafham WTW, GRAFHAM WTW, Perry, HUNTINGDON Cambridgeshire, PE28 0BW, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
GRAFHAM-WTW ,PERRY, PE28 0BW (10 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
8.08 MW
GRAFHAM-WTW, PERRY, PE28 0BW (32 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
8.95 MW
9.48 MW
Grays High St - South Essex RM17 6LU (1 component)

Commercial sites

Inactive •
9.48 MW
Loading map...
Showing 25 locations