ENEL X UK LIMITED
677 unique locations (6399 components) - Page 21 of 28
Cleeve WTW, Springhill Road, Cleeve, Reading, United Kingdom, RG8 0BY (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Cleethorpes Kings Road, CLEETHORPES-KINGS ROAD TPS, Kings Road, CLEETHORPES South Humberside, DN35 0AG, (7 components)
The CMU Component reduces import demand by turning on back up generation.
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (1 component)
44MW Storage consisting of 11 x 4MW units
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (1 component)
44MW Storage consisting of 11 x 4MW units
Clacton STW, CLACTON-HOLLAND HAVEN STW, Holland Haven, CLACTON-ON-SEA Essex, CO15 5TZ (8 components)
The CMU Component reduces import demand by turning on back up generation.
Church Wilne WTW, Draycott Road, Sawley, Long Eaton, Nottinghamshire, NG10 3AZ (2 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Church Wilne WTW, Draycott Road, Sawley, Long Eaton, Nottinghamshire, NG10 3AZ (8 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Church Wilne WTW, Draycott Road, Sawley, Long Eaton, Nottinghamshire, DE72 3QG (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Church Manorway, Erith DA8 1DL (82 components)
gas-fired CHP unit
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Chew Stoke, Bristol, BS40 8XS (4 components)
"Bristol Water Plc Chew Stoke, Bristol, BS40 8XS The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes …
Chew Magna Pump Station, Winford Road, Chew Magna, Bristol, BS18 8QQ (4 components)
"Bristol Water Plc Chew Magna Pump Station, Winford Road, Chew Magna, Bristol, BS18 8QQ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also …
Cheddar Road, Axbridg, Cheddar, BS26 2DL (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity
Chatteris STW, CHTTER A142 Chatteris Nightlayers, Fenton Way, Chatteris, CAMBRIDGE, PE16 6TT (8 components)
The CMU Component reduces import demand by turning on back up generation.
Cauldwell Walk, Bedford, MK42 9DT (4 components)
"EMR European Metal Recycling Cauldwell Walk, Bedford, MK42 9DT The CMU Component reduces import demand by turning off equipment and other non-essential loads."
Cauldon Works, Yelsway Lane, Waterhouses, Staffordshire, ST10 3EQ (4 components)
"Lafarge Cauldon Ltd Cauldon Works, Yelsway Lane, Waterhouses, Staffordshire, ST10 3EQ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation …
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (9 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
CATON INTAKE, Lancaster, UK, LA2 9BF (7 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Caterham Church Walk - Croydon and Epsom CR3 6RT (1 component)
Commercial sites
Castle Road, Eurolink Industrial Estate, Sittingbourne, Kent, ME10 3TN (3 components)
"Wienerberger Ltd Castle Road, Eurolink Industrial Estate, Sittingbourne, Kent, ME10 3TN The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation …
Castleford Carlton Ln Sc - The Ridings WF10 1AD (1 component)
Commercial sites
Canwick STW, CANWICK STW, Washingborough Road, (B1190) Canwick, LINCOLN, LN4 2RN, (8 components)
The CMU Component reduces import demand by turning on back up generation.