Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

383 unique locations (3919 components) - Page 1 of 16

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
1-3 Loicher Lane, Ecclesfield, Sheffield, S35 9XN (9 components)

Generating unit

Active • 2025-26 (T-4)
1 Mallard Road, Peterborough, PE3 8YN (3 components)

"Planet Ice - UK 1 Mallard Road, Peterborough, PE3 8YN The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
1 Midland Road, London, NW1 IAT (3 components)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Active • 2019-20 (T-1)
1 Thane Road West, Nottingham, NG2 3AA (155 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2022-23 (T-1), 2022-23 (T-4) ...
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (28 components)

CHP Unit

Active • 2023-24 (T-1), 2023-24 (T-4) ...
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2025-26 (T-4)
14.00 MW
9 Roding Rd, London E6 6LF (2 components)

The CMU Component reduces demand

Active • 2025-26 (T-4)
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
0.61 MW
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (12 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
2.61 MW
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Alton 52 High Street - Hampshire and South Downs GU34 1ET (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Ambleside Market Cross - Lakes LA22 9BT (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Amersham Sycamore Rd - East Berkshire HP6 5DR (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
14.00 MW
Ardagh Glass, Headlands Lane, Knottingley WF11 0HP (26 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Ardagh Glass, Portland Place, Irvine KA12 8JA (22 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO1 2TT (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2025-26 (T-4)
8.08 MW
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-4)
Ashford High St Kent - South and East Kent TN24 8TB (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Ashton Keynes WTW, North End, Ashton Keynes, Swindon, United Kingdom, SN6 6NZ (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-4)
ASWARBY WW, LONDON ROAD A15 ASWARBY, NG34 9SE (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2021-22 (T-4), 2022-23 (T-1) ...
8.08 MW
Axford WTW, White's Hill, Axford, Marlborough, United Kingdom, SN8 2HA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-4), 2024-25 (T-1) ...
4.09 MW
Loading map...
Showing 25 locations