Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

631 unique locations (5208 components) - Page 5 of 64

Active MW: 3185.36 MW
Inactive MW: 6993.24 MW
WANSFORD INTAKE, WANDSFORD, PE8 6LG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
WANSFORD INTAKE, PETERBOROUGH, PE8 6PN (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Walderton Pumping Station, Walderton, Walderton, P018 (3 components)

"Portsmouth Water Walderton Pumping Station, Walderton, Walderton, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes …

Inactive • 2017-18 (TR)
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (22 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Uttons Drove STW, Uttons Drove STW, Off Andersons Road, Swavesey Road, CAMBRIDGE, CB24 4UQ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Upminster STW, UPMINSTER STW, St Marys Lane, North Ockendon, UPMINSTER Essex, RM14 3PA (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
University of Warwick, Coventry, CV4 7AL (63 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
Loading map...
Showing 10 locations