Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENERSYST LIMITED

6 unique locations (98 components)

Castle Hill Road, Bransholme, Sutton, Kingston Upon Hull, HU7 4TX (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (29 components)
• Glenlee hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 30MVA or 24MW at 0.8PF. Each of the 2 components = 12MW.
• Glenlee hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 30MVA or 24MW at 0.8PF. Each of the 2 components = 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.89 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (22 components)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon Power Station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical i.e. 12MW for each of unit 1 and unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.84 MW
Loading map...
Showing 6 locations