Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENERSYST LIMITED

24 unique locations (62 components) - Page 2 of 3

Hirwaun House, Hirwaun Industrial Estate, Hirwaun CF44 9UL (1 component)

5 x 2.0 MW OCGT gas reciprocating engines

Inactive • 2020-21 (T-4)
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAURELS HIGH ROAD BURGH CASTLE GREAT YARMOUTH NORFOLK NR31 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
LINKS LANE ROWLAND'S CASTLE HAMPSHIRE PO9 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
MANSION RISE CASTLE HILL EBBSFLEET VALLEY SWANSCOMBE KENT DA10 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
North Castle Street Buckie Banffshire AB56 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT (2 components)
• 2 x 2 MW OCGT gas reciprocating engine
• 5 x 2MW OCGT gas reciprocating engine
Inactive • 2020-21 (T-4)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
St Johns Town of Dalry Castle, Douglas Kirkcudbright, DG7 3SR (4 components)
• Earlstoun hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4)
12.74 MW
Loading map...
Showing 10 locations