Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

154 unique locations (1085 components) - Page 5 of 7

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Crowhurst Bridge, 62 Shrub Lane, Etchingham, TN19 7EB (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Dunswell Road, Cottingham, Hull HU16 4JT (6 components)

Two CHP engines, 1.94MW and 1.46MW (total 3.4MW) in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (11 components)

Combination of load curtailment and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (31 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Active • 2017-18 (T-1), 2018-19 (T-1) ...
entre Bailey Road,Central Park, Rugby CV23 0PD (7 components)
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (10 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4) ...
3.22 MW
GCHQ, Hubble Road, Cheltenham, GL51 0EX (7 components)

Load reduction

Active • 2017-18 (T-1), 2020-21 (T-4)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (7 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Active • 2017-18 (T-1), 2020-21 (T-4)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Harbour House, Marine Parade Dover Kent CT17 9BU (8 components)
• Multiple POSGUs (standby diesel generators).
• Sixteen POSGUs (standby diesel generators).
Active • 2017-18 (T-1), 2020-21 (T-4) ...
High Dike, Grantham NG32 3QD (8 components)

Load reduction on flexible electricity consuming processes

Active • 2017-18 (T-1), 2020-21 (T-4) ...
High Street Waterham Kent ME13 9EJ (6 components)

6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (8 components)

Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Iceland Foods 5 Solar Way Innova Park Brimsdown Enfield EN3 7XY (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (7 components)

Mixture of load reduction and standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Iceland Foods Second Avenue Deeside Industrial Park Deeside Flintside CH5 2NW (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (7 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Joan Ln, Bamford, Hope Valley S33 6RB (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (9 components)

Mix of load reduction and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Kings Park Road, Moulton Park, Northampton, NN3 6NW (8 components)
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (6 components)

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil

Active • 2017-18 (T-1), 2020-21 (T-4)
Lyndon, West Bromwich, West Midlands B71 4HJ (7 components)
• Load curtailment on site via standby generation
• Standby generation supporting load curtailment
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Main Street, Brough, East Yorkshire HU15 2PR (8 components)

Two assets 1.4MW and 1.9MW, both CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Loading map...
Showing 25 locations