Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

55 unique locations (316 components) - Page 1 of 6

172-174 Rye Lane PeckhamLondon, London, SE15 4NB (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.32 MW
Asda Armadale, Armadale Station Station Road, Armadale, EH48 3ZZ (5 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2021-22 (T-4) ...
0.20 MW
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• Load curtailment at site via standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
14.05 MW
Asda Bournemouth, Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (6 components)
• Mix of load curtailment and standby generation (2)
• Load curtailment and standby generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4.56 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)

Load reduction (3)

Active • 2025-26 (T-4), 2022-23 (T-4) ...
8.13 MW
Asda Cheltenham, Hubble Road, Cheltenham, GL51 0EX (3 components)
• Load reduction (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
7.58 MW
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)

Load reduction on flexible electricity consuming processes (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.82 MW
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Standby diesel generator that reduces site load when generating. (2)
• Standby generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.92 MW
Loading map...
Showing 10 locations