Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

2 unique locations (17 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Asda Hounslow, Parkway Trading Estate Cranfield Lane TW5 9QA (8 components)
• Existing Energy from Waste Plant
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.40 MW
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (9 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Two CHP engines in horticultural environment with no auxilliary load
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 2 locations