FLEXITRICITY LIMITED

38 unique locations (342 components) - Page 1 of 4

323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Barrow Man Road Birchington Kent CT7 0AX (10 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Loading map...