Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

24 unique locations (250 components) - Page 1 of 3

323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)

3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment

Active • 2024-25 (T-4), 2023-24 (T-4)
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (5 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.50 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.27 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (11 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
6.72 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 10 locations