Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

374 unique locations (1406 components) - Page 1 of 15

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Wytch Farm, Wareham BH20 5JR (7 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (10 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Unit 2 Northside, Freightliner Road, Brighton Road Industrial Estate, Hull HU3 4UW (1 component)

10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …

Inactive • 2022-23 (T-4)
"Unit 1 Carter Square, Uttoxeter, ST14 8EU" (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
The Old Cricket Ground Dane Street OL12 6XT (2 components)

Load drop

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Thearn Lane Woodmansey Beverley HU17 0SA (6 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Thanet Earth 2 Barrow Man Road Birchington Kent CT7 0AX (6 components)

Two CHP engines of 3.0MW and 2.4MW respectively. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (6 components)

2 x POSGU , each 0.8MW

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Stretfield, Derbyshire, S33 9JT (2 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1)
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (3 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Saddlebow Road, Saddlebow, King's Lynn, Norfolk, PE34 3AG (1 component)

The construction of an peaking plant energy centre, which will house 15 gas engines and may be enhanced in future by battery storage.

Inactive • 2021-22 (T-4)
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (6 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Roundswell Business Park, Barnstable, Devon EX31 3TD (3 components)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (5 components)

One CHP of 1.0MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Park Lane Cottingham East Yorkshire HU16 5RX (6 components)

Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (10 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (9 components)

2 x POSGU (each 1MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations