Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

641 unique locations (6235 components) - Page 3 of 65

Mythe Road. Tewkesbury. Gloucester. GL20 6AA (14 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.93 MW
Montgomery Road, Aberdeen AB24 2YA (18 components)

District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.54 MW
Melrow Nursery, Rydings Lane, Southport PR9 8EB (15 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (19 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (22 components)

load curtailment at site

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.59 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (4 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2028-29 (T-4), 2025-26 (T-1)
1.94 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (17 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.81 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (3 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (3 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2025-26 (T-4), 2022-23 (T-1)
Loading map...
Showing 10 locations