Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

1155 unique locations (11633 components) - Page 40 of 47

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (15 components)
• Gas engine system capable of exporting electricity.
• Multiple gas engines capable of exporting electricity.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (31 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (9 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (9 components)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land to the South East of Christchurch Road, Baglan, Port Talbot SA12 7BZ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (6 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land to west of Grange Lane Brinsworth Rotherham S60 1FG (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2021-22 (T-4)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (9 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, CM13 3SX (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (22 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (15 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (48 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• ... and 2 more unique descriptions
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Little Barford Power Station Little Barford St Neots PE19 6YT (28 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
London Road, Redhill, Surrey RH1 1LJ (3 components)

2 x POSGU , each 0.8MW

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW (1 component)

Battery Storage system to be installed at Langage Solar Park

Active • 2027-28 (T-4)
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (17 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2028-29 (T-4), 2025-26 (T-1)
Main Street, Brough, East Yorkshire HU15 2PR (6 components)

Two assets 1.4MW and 1.9MW, both CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Main Street, Burstwick, Hull, HU12 9EA (6 components)

Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Manchester Rd, Carrington, Manchester M31 4TG (30 components)

load curtailment at site

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations