Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

847 unique locations (7035 components) - Page 7 of 85

London Road, Redhill, Surrey RH1 1LJ (3 components)

2 x POSGU , each 0.8MW

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (17 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.81 MW
Land on Jameston Farm, Dalry Ayrshire KA24 4EY (1 component)

Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.

Inactive • 2022-23 (T-4)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LADYSMITH ROAD, GRIMSBY, DN32 9EE (3 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (3 components)

Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil

Inactive • 2020-21 (T-4), 2017-18 (T-1)
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (4 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 10 locations