FLEXITRICITY LIMITED

847 unique locations (7035 components) - Page 77 of 85

George at Asda, Atherleigh Way WN7 5RZ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
George Square Charles St Lane EH8 9AG (3 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (4 components)

Four POSGUs (standby diesel generators) each having 1.4MW capacity.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
• Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.27 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (3 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (3 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.18 MW
Loading map...
Showing 10 locations