Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

653 unique locations (8926 components) - Page 1 of 27

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Wrexham Industrial Estate Wrexham LL13 9UG (17 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Tuscany Park Express Way WF10 5UA (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (9 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Truro Pydar St - West Cornwall TR1 2BD (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Telford Forge Rp - Shropshire and Cheshire TF3 4AG (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Sutton Courtenay Rd, Abingdon, OX14 4SE (3 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2021-22 (T-4)
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 component)

Permitted Onsite Generator located at Waste Water Treatment works

Active • 2025-26 (T-4)
14.00 MW
Stratford U Avon Maybird - Chelthenham and Worcester CV37 0HZ (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
St Andrews Road, Kings Weston Lane BS11 9FG (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
Staithes Road, Washington NE38 8NW (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (7 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-1) ...
14.00 MW
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (2 components)

Water source Heat Pumps at 1748KW each - located at Horticultural site

Active • 2023-24 (T-4), 2022-23 (T-3)
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (12 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Saltend Lane, HULL, HU12 8PP (27 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rochdale Riverside RP - North Manchester OL16 1BE (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Redhouse Interchange, Adwick-Le-Street, DN6 7FB (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Princess Way, Burnley, BB12 0EQ (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Pedmore Road Brierley Hill West Midlands DY5 1LJ (16 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Pattinson Ind Est District 15, NE38 8QA (5 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.56 MW
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (16 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Meerbrook, Leek, Staffordshire, ST13 8SN (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Marsh Leys, Woburn Rd, MK43 9AB (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Magna Park, Hunter Blvd, Bitteswell, Lutterworth LE17 4XN (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
M74 Eco Park, Carlisle Road Lesmahagow ML11 0GU (3 components)

Load curtailment from on-site equipment in response to Flexitricity signal.

Active • 2028-29 (T-4)
7.99 MW
Loading map...
Showing 25 locations