Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

8 unique locations (93 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Verge off Fingle Drive, Nr Grafton Street, Stonebridge, MK13 0AY (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Verge in Woughton Leisure Centre Car Park, Rainbow Drive, Leadenhall, MK6 5EJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Land off Dukes Drive, Nr Princes Way Junction, Bletchley, MK2 2UP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Land inbetween Marlborough Street and Langland Road, MK6 4JX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Redditch, Jinnah Road, Redditch, B98 7ER (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)
• 99.000MW Battery Energy Storage site
• Load reduction on site supported by non-exporting standby generation.
• West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Asda Chester, Greyhound Retail Park unit 33, Chester, CH1 4QQ (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 8 locations