FLEXITRICITY LIMITED

5 unique locations (391 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (71 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 5 locations