FPC ELECTRIC LAND LIMITED

28 unique locations (64 components) - Page 1 of 2

Active MW: 76.55 MW
Inactive MW: 564.68 MW
Woodmancourt Godalming Surrey GU7 (1 component)
Active • 2028-29 (T-4)
RUGELEY ROAD BURNTWOOD STAFFORDSHIRE WS7 (2 components)

2MW CHP located at Salford

Active • 2028-29 (T-4), 2018-19 (T-1)
Meadow Dunburgh Road Geldeston NR34 (1 component)
Active • 2028-29 (T-4)
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (3 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
Hillpark Brae Edinburgh Midlothian EH4 (3 components)
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Wallingford Oxfordshire. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
HEYES LANE TIMPERLEY ALTRINCHAM CHESHIRE WA15 (3 components)
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Swansea South Wales. New build CMU employing reciprocating engines running on natural gas.The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
GRANGE AVENUE MONIFIETH DUNDEE DD5 (3 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. Venture Road, Fleetwood, Blackpool, FY7 8RS SD 332 447
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
FARM HERNHILL FAVERSHAM ME13 (3 components)
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Redfield Rd, Nottingham, NG7 2UJ. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
DOUGLAS TERRACE BROUGHTY FERRY DUNDEE DD5 (3 components)
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Merthyr Tydfil South Wales. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
DEXTOR CLOSE CANTERBURY KENT CT2 (1 component)
Active • 2028-29 (T-4)
CURVEN EDGE ROSSENDALE LANCASHIRE BB4 (3 components)
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Water Lane, Exeter, EX2 8QN. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
CRABTREE CLOSE ALLESTREE DERBY DE22 (1 component)
Active • 2028-29 (T-4)
CHARLWOOD DRIVE OXSHOTT LEATHERHEAD KT22 (3 components)
• Auxiliary load of 1,000 kW has been removed from the total gross generating capacity of 95 MW for the purposes of the grid connection capacity estimate. Thus the grid connection capacity is 94 MW and the anticipated de-rated capacity is 87.99 MW.
• Domestic EV charger
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
Bowfield Way Johnstone Renfrewshire PA9 (3 components)
• " Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"
• Aux. load separately metered; ROCable hydro units within the BMU are not included in the CMU.
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations