Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FPC ELECTRIC LAND LIMITED

8 unique locations (20 components)

Active MW: 151.52 MW
Inactive MW: 0.00 MW
Land adjacent Mount Pleasant Farm, Green Lane, Barton, Preston, PR3 0RP (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Preston0084 Not Prequalified PR3
Active • 2027-28 (T-4)
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stourport0081 Not Prequalified DY13
Active • 2027-28 (T-4)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Ratcliffe0082 Not Prequalified NG11
Active • 2027-28 (T-4)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU KEMSLEY089 Kemsley B1 +2 more Rejected ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley B1 Stirchley B2 +1 more B30
Active • 2027-28 (T-4), 2026-27 (T-4)
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active • 2027-28 (T-4), 2025-26 (T-4)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

Storage (Duration 1.5h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON0076 Hawkins Not Prequalified DE14
Active • 2027-28 (T-4), 2026-27 (T-4)
Loading map...
Showing 8 locations