Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FPC ELECTRIC LAND LIMITED

5 unique locations (9 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active • 2025-26 (T-4)
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 component)

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Tetron Point Not Prequalified DE11
Active • 2024-25 (T-4)
Land Lying to the South of Diplocks Way, Hailsham, BN27 3YN (1 component)

4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hailsham

Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Hailsham Not Prequalified BN27
Active • 2025-26 (T-4)
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (3 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Waterswallows A Waterswallows B +1 more Not Prequalified SK17
Active • 2024-25 (T-4)
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Reciprocating engines FPC ELECTRIC LAND LIMITED New Build Generating CMU Waterswallows D Waterswallows E Not Prequalified SK17
Active • 2024-25 (T-4)
Loading map...
Showing 5 locations