First Hydro Company

15 unique locations (472 components)

Active MW: 1391.72 MW
Inactive MW: 4358.93 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (11 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (48 components)
• 1hr duration battery storage project.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Headways, Stanley, Wakefield WF3 4BY, United Kingdom (26 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New reciprocating gensets in acoustic enclosure
• Octopus Energy customers actively turning down their demand when requested to do so
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (7 components)

Reciprocating genset in acoustic enclosure

Active • 2024-25 (T-4), 2021-22 (T-1)
Land off Nottingham Rd, Loughborough Leicestershire LE11 1ET (18 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SF (15 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Multi Shaft CCGT (Module 1)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton, Hampshire, SO16 0YD (4 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (7 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• E1000 CHP
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...