Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

First Hydro Company

26 unique locations (101 components) - Page 1 of 2

Active MW: 1391.72 MW
Inactive MW: 4358.93 MW
Wimbourne Bournemouth BH21 5EP (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Vacant Land off Weighbridge Rd, Deeside, Flintshire, CH5 2LF (2 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (1 component)

The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery …

Battery Shaw-Energi Ltd Not Prequalified WA12
Inactive • 2021-22 (T-4)
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Union Street, Manchester, M27 4HL (4 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Steventon Road, Abingdon, OX13 6RW (4 components)
• 5 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• 8 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pilsworth Rd, Heywood OL10, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
New Winning Pumping Station CastleEden Hartlepool Cleveland, TS27 4TF (3 components)

3 MW of demand reduction

DSR LIMEJUMP LTD Conditional TS27
Inactive • 2022-23 (T-4), 2019-20 (T-1)
MOONSHILL QUARRY, STOKE HILL, STOKE ST. MICHAEL, RADSTOCK, BA3 5JU (8 components)
• 0.1MW of demand reduction
• 3MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Maw Green Landfill Site Maw Green Road Coppenhall Crewe Cheshire CW1 5NG (1 component)

Gas Fired Reciprocating Engine(s)

Inactive • 2022-23 (T-4)
Lochaber Smelter, Fort William, PH33 6TH (3 components)

Metal smelting site

Inactive • 2017-18 (TR)
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)

3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land at Silverwood colliery site, Hollings lane, Ravenfield, Rotherham, S65 4LQ. (2 components)
• A 20MW New Build gas fuelled generating station.
• A New Build gas fuelled generating station.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (11 components)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (2 components)

10 x 2MW gas reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (5 components)

Standby generation

Inactive • 2020-21 (T-4), 2017-18 (T-1)
BESTWOOD QUARRY, NOTTINGHAM ROAD A60, NOTTINGHAM, NOTTINGHAMSHIRE, NG15 8FL (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Bentley Mill Way, Walsall, WS2 0BP (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Batchworth Cryptosporidium Barrier, Church Street, Rickmansworth, Hertfordshire, WD3 1JJ (6 components)
• Water Pumping Station
• Water pumping station
Inactive • 2017-18 (TR)
Ash Rd, Elton, Chester, CH2 4LF (3 components)

Manufacturing site

Inactive • 2017-18 (TR)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (18 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations