Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

154 unique locations (1085 components) - Page 1 of 7

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (13 components)

3 x 1.6MW POSGU (standby generation)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Windmill Hill Business Park, Swindon, SN5 6QR (8 components)
• Load curtailment and standby generation
• Load reduction via standby generation taking onsite load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Unit 5 Brown Lane West, Leeds. LS12 6BF (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Thearn Lane Woodmansey Beverley HU17 0SA (7 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Thanet Earth 2 Barrow Man Road Birchington Kent CT7 0AX (6 components)

Two CHP engines of 3.0MW and 2.4MW respectively. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (8 components)

2 x POSGU , each 0.8MW

Active • 2017-18 (T-1), 2020-21 (T-4)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Stretfield, Derbyshire, S33 9JT (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4)
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (11 components)

2 POSGU (1.0MW and 0.6MW)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (6 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Riverside House, Main Street, Rotherham S60 1AE (10 components)

Load reduction and generation via standby assets

Active • 2017-18 (T-1), 2020-21 (T-4) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (6 components)

One CHP of 1.0MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Pudding Lane Spalding, Lincs, PE11 3TJ (9 components)
• Load curtailment and standby generation
• Load curtailment via standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (9 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (8 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Pipers Way, Swindon, Wiltshire, SN38 1SN (7 components)
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Park Lane Cottingham East Yorkshire HU16 5RX (8 components)

Gas CHP engines in commercial horticultural environment with one 1.3MW engine and one 1.5MW engine plus two 0.95MW gas CHP. Primary fuel type = Natural Gas. No auxilliary load

Active • 2017-18 (T-1), 2020-21 (T-4)
Paddington Green Campus, London, W2 1NB (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (13 components)

2 x POSGU (each 1MW)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Monument Road, Bicker, Lincolnshire PE20 3DJ (8 components)
• Load curtailment and standby generation
• Load curtailment at site via standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Loading map...
Showing 25 locations