Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

187 unique locations (2092 components) - Page 1 of 8

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Wrexham Industrial Estate Wrexham LL13 9UG (17 components)

Load reduction

Active • 2020-21 (T-4), 2021-22 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (13 components)

3 x 1.6MW POSGU (standby generation)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Windmill Hill Business Park, Swindon, SN5 6QR (8 components)
• Load curtailment and standby generation
• Load reduction via standby generation taking onsite load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
UNIT R2 ASHFORD AIRPORT, COLD STORE, LYMPNE, HYTHE, KENT, CT21 4LR (2 components)

Load drop at large Industrial cold storage

Active • 2020-21 (T-4)
Unit 5 Brown Lane West, Leeds. LS12 6BF (9 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Thearn Lane Woodmansey Beverley HU17 0SA (7 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Thanet Earth 2 Barrow Man Road Birchington Kent CT7 0AX (6 components)

Two CHP engines of 3.0MW and 2.4MW respectively. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (8 components)

2 x POSGU , each 0.8MW

Active • 2017-18 (T-1), 2020-21 (T-4)
SUPPLY TO R1, UNIT R1-R8, LYMPNE INDUSTRIAL ESTATE, LYMPNE, HYTHE, CT21 4LR (2 components)

Load drop at large Industrial cold storage

Active • 2020-21 (T-4)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (11 components)

2 POSGU (1.0MW and 0.6MW)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Seafield Road, Edinburgh EH6 7LQ (23 components)

Standby generation, submetered, taking site load

Active • 2019-20 (T-1), 2020-21 (T-4) ...
1.99 MW
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (6 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Riverside House, Main Street, Rotherham S60 1AE (10 components)

Load reduction and generation via standby assets

Active • 2017-18 (T-1), 2020-21 (T-4) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (6 components)

One CHP of 1.0MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Pudding Lane Spalding, Lincs, PE11 3TJ (9 components)
• Load curtailment and standby generation
• Load curtailment via standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (9 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (8 components)
• Load curtailment and standby generation
• Mix of load curtailment and standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Pipers Way, Swindon, Wiltshire, SN38 1SN (7 components)
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Pedmore Road Brierley Hill West Midlands DY5 1LJ (16 components)

Load reduction

Active • 2020-21 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations