FLEXITRICITY LIMITED

34 unique locations (459 components) - Page 1 of 2

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (15 components)
• Load reduction
• Load shedding
Active • 2020-21 (T-4), 2021-22 (T-4) ...
Bailey Drive Gillingham Business Park Gillingham ME8 0PZ (13 components)

Load reduction

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Benfield Way Lakes Road Braintree CM7 3YS (15 components)
• Load reduction
• Load reduction.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2023-24 (T-4) ...
3.56 MW
Cairnton Road, Boyndie, Banffshire, AB45 2LR (10 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (5 components)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Active • 2021-22 (T-4), 2022-23 (T-3) ...
2.58 MW
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (10 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (12 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2020-21 (T-4), 2021-22 (T-4) ...
2.38 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
Dock Yard Rd, Ellesmere Port, CH65 4EG (12 components)
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
Active • 2020-21 (T-4), 2021-22 (T-4) ...
2.58 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (7 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (6 components)
• Load drop
• Load drop by on-site generation
Active • 2020-21 (T-4), 2021-22 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (10 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4) ...
3.22 MW
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (39 components)

load curtailment at site

Active • 2022-23 (T-3), 2022-23 (T-4) ...
11.07 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2022-23 (T-3), 2022-23 (T-4) ...
14.00 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (19 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2020-21 (T-4), 2021-22 (T-4) ...
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (14 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.60 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)

load curtailment at site

Active • 2020-21 (T-4), 2021-22 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (32 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (22 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2021-22 (T-4), 2022-23 (T-3) ...
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
3.56 MW
Ottringham Road Keyingham Hull North Humberside HU12 9RX (13 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Active • 2020-21 (T-4), 2021-22 (T-4) ...